湖南电力 ›› 2021, Vol. 41 ›› Issue (1): 11-17.doi: 10.3969/j.issn.1008-0198. 2021. 01. 003

• 研究与试验 • 上一篇    下一篇

基于双种群CSO算法重构的含DG配网故障恢复

罗春辉1,瞿纲举1,汤涛2,3,刘珺瑶1,蒋嘉栋1,罗伟原4   

  1. 1.湖南省送变电工程有限公司,湖南  长沙  410015;
    2.智能电网运行与控制湖南省重点实验室,湖南  长沙  410114 ;
    3.长沙理工大学,湖南  长沙  410114;
    4.国网湖南省电力有限公司检修公司,湖南  长沙  410004
  • 收稿日期:2020-08-17 修回日期:2020-10-30 出版日期:2021-02-25 发布日期:2021-03-29
  • 基金资助:
    国家自然科学基金资助项目(51677060, 51737002)

Service Restoration of Distribution Network with DG Based on Dual-population CSO Algorithm

LUO Chunhui1,QU Gangju1,TANG Tao2,3,LIU Junyao1,JIANG Jiadong1,LUO Weiyuan4   

  1. 1. Hunan Electric Power Transmission and Transformation Engineering Co.,Ltd., Changsha 410015, China;
    2. Hunan Province Key Laboratory of Smart Grids Operation and Control, Changsha 410114, China;
    3. Changsha University of Science and Technology, Changsha 410114, China;
    4. State Grid Hunan Electric Power Company Limited Maintenance Company, Changsha 410004, China
  • Received:2020-08-17 Revised:2020-10-30 Online:2021-02-25 Published:2021-03-29

摘要: 为兼顾配网故障恢复的快速性和最优性,提出一种基于重构的分级响应故障恢复方法,并应用双种群纵横交叉( crisscross optimization algorithm, CSO)算法寻求重构方案。首先在故障隔离后利用启发式规则进行局部重构,以较少的开关动作次数快速恢 复配网连通性。然后在局部重构后有安全指标越限时,利用改进的双种群二进制纵横交叉算法在可行域内搜索最优解进行全局重构。若全局重构后安全指标依然越限,按负荷重要性指标切除部分非关键负荷,恢复配电网安全运行。最后,改进的PG&E配电系 统仿真结果验证了该方法的可行性和有效性。

关键词: 配电网, 故障恢复, 重构, 可行域, 纵横交叉算法

Abstract: To guarantee both the speediness and global optimization of service restoration of distribution network simultaneously, a hierarchical response fault recovery method based on reconfiguration is proposed, and the crisscross optimization ( CSO) algorithm with dual dual-population is applied to seek the reconstruction scheme. Firstly, partial reconstruction using heuristic rules for non-islanding operation is implemented for fast restoration of distribution network connectivity with fewer switching times. Secondly,the optimal solution is searched in the feasible region by CSO algorithm with dual dual-population for global reconstruction while the safety indicators are over-limit, and if the safety indicators are still over-limit, part of non-critical load is shed in the order of the importance index of the load until the disribution network is back to a new safe operation state. Finally, the feasibility and effectiveness of the proposed method are verified by simulation results of improved PG& E distribution system.

Key words: distribution network , service restoration, reconfiguration, feasible region, crisscross optimization algorithm